Reports / memories of practice |
Deliverables for the lab project.
50% of the final grade corresponds to tasks associated to a lab project. Along the course there will be six milestones, corresponding to each of the stages for the Matlab implementation of a simplified OFDM receiver. The weight given to each of these tasks is the following:
Task 1 (Demodulation to baseband): 5%
Task 2 (Mode detection and temporal allignment): 5%
Task 3 (Frequency error correction): 10%
Task 4 (Frame synchronization): 10%
Task 5 (Channel estimation and equalization - I): 10%
Task 6 (Channel estimation and equalization - II): 10%
|
50 |
|
B4 B9 B12
|
C71
|
D2 D4
|
Jobs and projects |
Projects on any of the digital communication standards that employ the techniques presented in the classroom.
Possible topics include:
- Digital radio (DAB, DAB+, DRM)
- Digital terrestrial television (DVB-T, DVB-H, DVB-T2)
- LAN and MAN wireless networks.
- ADSL and VDSL
- Comunicaciones over PLC and multimedia over coax (MoCA)
- LTE
- LiFi
The project must focus on those aspects of the standards that are related to the subjects covered by the lectures and should consider the following issues:
- Historical aspects: previous standards solving similar problems.
- Technical aspects: details about the employed modulation, bandwidth, channel coding, etc.
- Applications of the standard.
- Deployment degree at national and international levels.
|
30 |
|
B4
|
C71
|
D2
|