Students may choose one of the following two assessment options: 1) Continuous assessment: Final grade will consist of: - final project (up to 6 points) - homework assignments (up to 4 points) A minimum grade of 30% in the final project is required in order to pass the course. Otherwise, the overall grade will directly be that of the final project. Homework grades from the first call will be kept for the second call, in which the student will be allowed to resubmit the final project. 2) One-shot assessment: The final grade is the one achieved in the comprehensive test, for both the first and second call. Any kind of plagiarism will result in automatically failing the course. |