The student will be able to comprise the structure of integration inside a project, relating all the areas of knowledge in the plan of management |
|
|
C3 C4 C14
|
D1 D4
|
The student will be able to know and use the basic tools of taking of requirements and of control of the scope of a project |
|
|
C4 C5 C11 C13
|
D2 D4 D5
|
The student will be able to develop a structure of breakdown of work (*EDT) for the project |
|
|
C2 C3 C5 C6 C13 C14
|
D2
|