2. INNER INSTALLATIONS OF PLUMBERY |
Cold and hot water sanitary
Groups of pressure
Calculation of installations.
Rule |
5. STATIONS *ETAP (Station of Treatment of Drinkable Waters) and *EDAR (Station Debugger of Residual Waters) |
*ETAP: Design
*EDAR: Design (Types of treatment) -*Pretratamiento -Primary Treatment -Secondary Treatment (Biological System) -Tertiary Treatment (*Ultrafiltración and Ultraviolet Rays). |